Power Line Photos March 23-24

March 24 - at work on the tower shown in the previous photo.

March 23, around 5:00PM – at work on the new tower halfway up toward the ridge on the Picatinny side

Picatinny side

Tower construction 6:49 pm, March 23  bringing more material to tower shown in the previous photo
March 23, 6:49PM – Tower construction: Bringing more material to the same tower
March 23 - on the ridge - Picatinny side
March 23 – on the ridge – Picatinny side
March 24 Berks
March 24 – Berkshire Valley Road side looking away from Longwood Lake
March 24 Berkshire Valley Road side
March 24 same tower as in previous photo looking back toward the Lake

Wow! This is happening fast!

Photos taken by Jeff, Dick & Eva-Lee